📋 Tender Overview
The contract involves the design, supply, installation, and commissioning of new Automated Weather Observation Systems (AWOS), as well as the decommissioning of the existing Automated Weather Observation Systems (AWOS) at Cape Town International Airport, Chief David Stuurman International Airport, George Airport, Upington Airport, and Kimberly Airport for a period of 24 months. Additionally, it includes the maintenance of Automated Weather Observation Systems at George Airport, Upington Airport, and Kimberly Airport for a period of 60 months. Automated Weather Observation Systems (AWOS)