📋 Tender Overview
The project involves the design, engineering, supply, construction, erection, testing, and commissioning of grid-connected solar power plants. This includes the installation of necessary infrastructure such as 11kV or 33kV lines connecting the solar plants to the power sub-stations, along with comprehensive operation and maintenance for a period of 25 years. The solar power plants will be set up to solarize agricultural and mixed feeders, ensuring reliable power supply to the agricultural sector. Solar Power Plants, 11kV or 33kV transmission lines