📋 Tender Overview
The project involves the design, construction, installation, and commissioning of a Material Recovery Facility (MRF) with a capacity of 10 tons per day for processing dry waste. The selected agency will also be responsible for the operation and maintenance of the facility for a period of five years. The facility will include infrastructure for the segregation and recovery of recyclable materials from municipal solid waste, ensuring compliance with applicable environmental regulations. Material Recovery Facility (MRF), 10 TPD capacity