📋 Tender Overview
Sr.DEN/South/SBC section: Chikka Banavara - Hassan section: SW-I: Strengthening
of bank by providing standard width and improving drainage at isolated locations
for a length of 6.28km(0-6m) and 3.57km(6-12m) in ADEN/Kunigal section. SW-
II:Strengthening and protection of slopes of cutting from km 128/750-129/200
between Shravanabelagola - Channarayapatna stations in ADEN/Kunigal section.
Maintenance period is 6 months or one monsoon period whichever is later.