📋 Tender Overview
The contractor is required to provide all necessary materials, equipment, and personnel to perform dockside repairs to the U.S. Coast Guard Cutter USCGC OAK (WLB 225 B) during its FY27 dockside availability at Naval Station Newport, RI, in accordance with the solicitation and attached specifications. Dockside repairs, materials, equipment, personnel