📋 Tender Overview
The contractor is required to provide all necessary materials, equipment, and personnel to perform drydock repairs to the U.S. Coast Guard Cutter USCGC PATOKA (WLB 203) during its FY27 Drydock Availability. drydock repairs, materials, equipment, personnel