📋 Tender Overview
Construction of a laboratory building, including the installation of sanitary technical systems. 381 m wastewater pipe cast 2K-epoxy coating, various DN; 342 m wastewater pipe galvanized steel, various DN; 678 pipe clamp galvanized steel L up to 0.5m, various DN; 28 pcs. outlet gravel trap flat roof pressure system stainless steel, various DN; 2,185 m wastewater pipe PE heat-resistant, various DN/OD; 2,900 pcs. welding socket wastewater pipe PE heat-resistant, various DN/OD; 5 pcs. wastewater lifting station; 1 pcs. sewage lifting station H 14.5 m 2 pumps control unit IP54; 234 pcs. forced circulation device, various DN; 900 pcs. ball valve PN10 AD, various DN; 3 pcs. pressure boosting system centrifugal pump; 1 pcs. deionization double unit ion exchange process TW 12m3/h; 1 pcs. reverse osmosis unit 5000l/h control unit; 1 pcs. electro-deionization; 1 pcs. heat exchanger unit 10 kW and heating element; 195 pcs. installation electrical B 600 mm wall-mounted; 19 pcs. electronic moisture-proof spotlight; 46 pcs. hybrid fitting washbasin mixer DN15 single lever mixer; 63 pcs. floor-mounted WC sanitary porcelain glazed rounded; 73 pcs. emergency shower wall-mounted projection 700-800mm unheated.