📋 Tender Overview
The project involves the construction and installation of a water supply scheme, including the provision of a 200 mm tubewell to a depth of 95 meters, a pump chamber measuring 3.05 x 3.70 meters, and an overhead storage reservoir with a capacity of 50,000 liters. Additional tasks include the installation of solar panels, pumping machinery, a chlorination unit, and the laying of rising mains and distribution systems, along with house service connections and environmental considerations. Tubewell, Pump Chamber, OHSR, Solar Panel, Pumping Machinery, Chlorination Unit, Rising Main, Distribution System, House Service Connections