📋 Tender Overview
The project involves the construction of an ESTW-Z (electronic interlocking system) at Regensburg Ost station, which will completely replace the existing five mechanical interlocking systems. The cable management system will be newly constructed in various forms and lengths: Size I approximately 2.3 kilometers, Size II approximately 4.4 kilometers, Size III approximately 1 kilometer, and Size IV approximately 2 kilometers. Additionally, the implementation requires supplementary crossings and shafts (including Sizes II, III, IV, V, VII, IX, and X) to ensure cable connections. The project will also include crossings with varying pipe lengths from 5 to 50 meters. Besides the establishment of the ESTW-Z, the project includes equipping several track sections with safety technology and overhead line systems, as well as the adaptation of telecommunications and 50Hz systems. Cable management systems, crossings, shafts, safety technology, overhead line systems, telecommunications systems, 50Hz systems