📋 Tender Overview
The project consists of the consolidation and beautification of the sidewalks and central median of the first section of Av. Recoleta, incorporating criteria for universal accessibility, energy savings, and rational use of water resources. This is materialized through the normalization of the sidewalk, which will have the minimum required width of 2 meters throughout the entire section and the incorporation of rolling devices where appropriate. Accompanying the new sidewalk, new 4-meter pedestrian lights will be installed, thus meeting the minimum lighting requirement for public spaces. The path of the sidewalk will also be accompanied by low water consumption and low maintenance vegetation, allowing this section of the avenue to have a characteristic profile that can be replicated throughout the rest of the extension. For the maintenance of this vegetation, the incorporation of an irrigation system is also considered, which will consist of technified irrigation, supported by quick coupling valves every 25 meters. It should be noted that an irrigation system is only considered for the western sidewalk and median, as the property front of Parque del Recuerdo already has such a system. The area to be intervened covers a total area of 3,968 m2.