📋 Tender Overview
This contract considers the intervention on the damaged elements of the dock, resulting from the advance of corrosion in the sector. It includes the preservation of the structure of the dock, beams, braces, chaza, grills, bitts, and crane. All elements are made of steel. Additionally, the intervention of the dock fenders is included. The installation of a temporary mooring point is planned while the dock is being worked on.