📋 Tender Overview
Complete replacement of the cold production equipment and partial replacement of the distribution systems in the clean rooms of buildings 105 and 121 at the Institute of Space Astrophysics (IAS) of CNRS. The work includes the replacement of the two existing chillers in buildings 105 and 121 with reversible heat pumps, the addition of an additional air treatment unit (CTA) on building 105, adaptation of existing CTAs to new production means, and modernization and optimization of the regulation of air treatment units to meet thermal, water, and pressure cascade needs of the clean rooms. The implemented equipment and their regulations must ensure the maintenance of the clean room temperature at 21°C (+/- 1°C), relative humidity at 55% (+/- 10%), and respect for pressure cascades between different rooms while optimizing energy consumption through effective regulation and suitable equipment. reversible heat pumps, air treatment unit (CTA)