📋 Tender Overview
ONE COACH SET OF SIDE WALL COMPLETE FOR 3PH MEMU/TC6 COACHES T .#* ONE COACH SET OF SIDE WALL COMPLETE FOR 3PH MEMU/TC6 COACHES TO DRAWING
NUMBERS: 747-1-4-001 ALT NIL. NOTE: DRG. NO. AAB14550 TO BE READ AS MVMC15013 ALT NIL. T
HE FIRM SHALL FULFILL THE REQUIREMENT AS PER ICF/MD/SPEC-200, ISSUE STATUS: 01, REVISION: 0
4 WITH AMENDMENT NO. 01 & REVISED APPENDED NOTE FOR STAINLESS STEEL SIDEWALL ASSEMBLY
DATED: 17.03.2025. SPECIAL CONDITION: 1) PACKING INSTRUCTION: MCF PI176 Ver. 0. 2) DPT (DYE P
ENETRATION TEST) OF CARLINE COMPLETE (IN ASSEMBLED CONDITION WITH SIDE WALL) TO BE PERF
ORMED AT FIRMS PREMISE BY TPI. [SAFETY ITEM] [ Warranty Period: 84 Months after the date of de
livery ] ]