📋 Tender Overview
Central heating executionwith a pellet boiler and domestic hot water- connect the boiler with the coil to the central heating installation.and proper exhaust ventilation in the bathroom in residential premises No. 4 in the building at ul.Dlugosza 2 in Walbrzych in the "design and build" mode (single-stage).