📋 Tender Overview
The project aims to complete the works related to the expansion of the sewage network in Zahle and its suburbs, which drain into the wastewater treatment plant in Zahle, and the project for additional sewage networks and pumping stations in Baaloul and Qaroun (GC2W2c), as part of the "Green Transformation in the Agricultural Food Sector for Economic Recovery (GATE)" project. The project includes completing the service loop and ensuring the full functionality of the sewage network in the Zahle area by implementing approximately 21 km of additional sewage lines and 468 household connections, and for the sewage network in the towns of Baaloul and Qaroun by implementing approximately 6 km of additional sewage lines and 90 household connections, then connecting these lines to the existing sewage networks in these areas, and updating the solar energy system for the existing pumping station in Qaroun (PS 7) by replacing the battery system and inverter, and providing a generator with a capacity of (120 kVA) for this station.