ScopeZurich airport says extending two runways would increase safety and simplify landing and take-off traffic.the upgrade as a step towards stablising operations. He rejected allegations that it was meant to increase capacities. The financial investment for the project is estimated at CHF250 million 278 million. Construction work is not expected to be launched before 2030. The Zurich cantonal government has approved the upgrade in principle but the cantonal parliament is still to debate the issue and voters are also likely to have a say. Zurich Airport ZRH has announced that various construction work will start along the runways and taxiways at the airport in spring 2021. These include maintenance works on the flight operations areas as well as work in connection with the renovation of runway 1028 which is planned for 2022. The flight operations areas namely runways taxiways and stands are exposed to a high level of stress due to the use of aircraft and vehicles. The maintenance of the pavement areas and the associated technical systems such as drainage or slope lighting is therefore a recurring task of the maintenance companies. As with every year local maintenance work is carried out at numerous locations on the flight operations areas from spring to autumn. Due to the coronavirus pandemic the renovation of runway 1028 which was originally announced for 2021 was postponed to 2022. The first preparatory work for the renewal of the electrical infrastructure has already started. From mid-April 2021 onwards pavement will be broken up in the area of the runways and taxiways due to line crossings. This work must take place outside of flight operating hours as the runway must be completely closed and will therefore be undertaken at night. The airport operator Flughafen Zrich AG is taking a number of measures with the construction companies to reduce construction noise emissions as far as possible. Mobile noise barriers are being used where the slope surface has to be broken up. In addition vehicles and construction machines must be used that comply with the emission limit values of the Machinery Noise Ordinance. Similarly construction transports may not be carried through residential areas. Nevertheless noise emissions cannot be avoided for certain types of work. Flughafen Zrich AG asks the affected population for their understanding.
π Key Information
π
Tender Reference No.
463968418
π
Publication Date
22 Jul 2021
π°
Estimated Value
USD 278000000
π
Sector
Aviation
π
Deadline
31 Dec 2030
π
Notice Type
Projects
π
Location
Switzerland
π
Contract Duration
9 Years 5 Months 9 Days
π
Documents & Downloads
No documents found
π·οΈ CPV
No CPV found