📋 Tender Overview
Scope /l
Zenzo – Cambutas Line is a 400kV overhead line with a length of 41km from Zenzo Hydropower Plant, Kwanza Norte, Angola, to Cambutas, Kwanza Norte, Angola.
The project is expected to be commissioned in 2035.
Description
Zenzo – Cambutas Line is an overhead line that will be operated by Rede Nacional de Transporte de Electricidade. The line will carry alternating current (AC) through double circuit cable.
Approximately $40.2m was financed by the authorities to undertake the construction works of the project.
Zenzo – Cambutas Line project development status
The construction works on the Zenzo – Cambutas Line project will be commenced in 2033 and commissioning is expected in 2035.