π Tender Overview
ScopeThe City of Barrie Multi-Modal Active Transportation Master Plan identified Yonge Street as a key transportation corridor and recommended several transportation improvements to accommodate the growth of Barrie to 2031.Transportation improvements include reconstruction and widening of Yonge Street to 5 lanes a cycle-track and a sidewalk between Mapleview Drive and Lockhart Road.The purpose of this project is to implement the preferred servicing solution as recommended by the Municipal Class EA process. See background.The City of Barrie has retained Ainley Associates for the provision of engineering services for the preliminary and detailed design of the preferred alternative design solution for Yonge Street between Mapleview Drive East and Lockhart Road approx. 1.4 km Contract administration construction inspection commissioning and warranty administration for these projects are provisional items.