📋 Tender Overview
Project ID : 53312602
Project Description and Rationale : The Class Environmental Assessment Study for the Wyecroft Road corridor from Kerr Street to Bronte Road recommended improvements to support all travel modes and improve current operations of the corridor. Improvements to Wyecroft Road between Fourth Line and Dorval Drive include an urban cross-section with one travel lane in each direction and a continuous 2-way left-turn lane, on-road buffered bike lanes and a sidewalk on both sides. Construction is scheduled for 2029.