📋 Tender Overview
Project ID : 53312112
Project Description and Rationale : The Wyecroft Road Improvements Environmental Assessment Study from Bronte Road to Kerr Street was completed and approved in 2020. The purpose of the EA study was to identify transportation improvements within the Wyecroft Road corridor. Improvements for Wyecroft Road between Bronte Road and Third Line include widening to four lanes (two in each direction) with a centre two-way left-turn lane, on-road buffered bike lanes, a sidewalk on the north side, a multi-use trail on the south side, a traffic signal at the Bronte GO Station bus loop for transit priority, and improvements at intersections. Construction is scheduled for 2026.