scopeThe Wisconsin Department of Transportation WisDOT is developing preliminary plans for a resurfacing project on WIS 58. The 6.73-mile long project begins in the Village of Cazenovia and heads northeast to the Village of La Valle.Proposed improvementsMill and overlay existing pavementUpdate curb ramps as needed to meet American with Disabilities Act ADA requirementsReplace guardrail and install energy absorbing terminals EATsWiden paved shoulders from 1-foot to 3-foot
🔍 Key Information
📄
Tender Reference No.
454796217
📅
Publication Date
08 Jul 2020
💰
Estimated Value
N/A
🌐
Sector
Roadways
📅
Deadline
31 Dec 2027
📝
Notice Type
Projects
📍
Location
United states
📑
Contract Duration
7 Years 5 Months 23 Days
📁