📋 Tender Overview
Scope of Work:
To Develop 37.8-MW Wind Project in Fukui City in Japan’s Fukui prefecture.
Description:
The duo will jointly conduct a development feasibility study for the project. The park is planned to feature nine 4.2 MW wind turbines to be installed at the foot of Mount Kunimidake in Fukui City. Construction is set to start construction in September 2024, while power generation is expected to commence by May 2027. Once up and running, the wind farm should be able to generate approximately 104,784 MWh of clean electricity per year, enough to meet the annual power consumption of some 29,106 local households. The development of the project will be carried out by SB Energy Fukui Sub-Branch.