Scope of Work West Lake Sammamish ParkwayNorth segment NE 8th Street to North City limits phase 5.DescriptionThis project will conduct a preliminary design of the fifth phase of the corridor improvements of five total between NE 8th Street and the north City limits. The full West Lake Sammamish Parkway project between I-90 and the north city limit will ultimately provide a consistent 4-foot-wide shoulder on the east side a 10.5-foot-wide northbound vehicle travel lane a 10-foot-wide southbound vehicle travel lane a 10-foot-wide multi-purpose trail 8 feet wide in approximately 2 of the corridor due to constricted space on the west side separated by a 1.5-foot shy distance space and a 2-foot- or 5-foot-wide landscaped buffer where space is available a signal at SE 34th Street if warranted and pedestrian crossings at SE 26th Street Northup Way NE 24th Street and at five other locations along the parkway. The project will also make storm drainage water quality and fish passage improvements throughout the corridor.
🔍 Key Information
📄
Tender Reference No.
467835193
📅
Publication Date
27 Nov 2021
💰
Estimated Value
USD 1000000
🌐
Sector
Water and Sanitation
📅
Deadline
31 Dec 2027
📝
Notice Type
Projects
📍
Location
United states
📑
Contract Duration
6 Years 1 Month 4 Days
📁
Documents & Downloads
No documents found
🏷️ CPV
No CPV found
Need help with this bid?
Our bid experts can help you find, evaluate & win more tenders.