📋 Tender Overview
Scope : Water Storage Maintenance Program
PROJECT DESCRIPTION/JUSTIFICATION : This project provides the funding to clean, spot prime and paint the interior and exterior of the Water Storage Tanks. Painting of water tanks is a cyclical program; coatings can last up to 20-25 years. A study was conducted in 2009. College Tower rehabilitation in FY23/24 $1.5M, Pennsylvania (2025/6, $1M), Park Hill (2027/8, $500,000), Westside Water Tower $500,000 FY28/29. Tank coatings required to maintain the structure of the tank, the water quality to reduce biofilm, as well as enhancing the aesthetics of the tanks. This project is related to Water Treatment Plant condition assessment and master planning in FY21. Starting in FY21 this project provides funding for the inspection of the former Vernon Water Tower located west on Hwy 20 prior to recoating. This project provides for Annual Tank Inspection for all tanks and towers of $25,000. Tank maintenance may be adjusted to reflect possible operational and capital improvements recommended in the Water Master Plan. Further analysis following installation of the Roosevelt Street Water Tower will provide the information necessary to determine the prioritization of tank coating work on the other water tanks.