📋 Tender Overview
Description:In 2019, 126,000 tonnes of waste and recyclables were received at the Waste & Recycling Centre (WRC) from the City of Lethbridge and surrounding communities. Since 1985, over 2.5 million tonnes of waste have been disposed of at the site. It is one of the largest landfill sites in Southern Alberta . The WRC Master Plan provides initial concept plans for the landfill gas (LFG) and leachate management systems. The following phases are considered for the 2022 to 2031 Capital Improvement Program (CIP): 1) Leachate Manhole Upgrades. 2) Leachate Collection System Design and Construction. 3) Leachate Management Plan. 4) Extend Gas Well System Phase 2 The system design and construction project that will be completed in 2021 has provided another layer to the future system and the next step will be the detailed design of the LFG utilization. This CIP includes one full time equivalent position to operate landfill gas and leachate system at the WRC.