Scope :
Utiundumbo is a 169MW hydro power project. It is planned on Queve river/basin in Angola. The project is currently in announced stage. It will be developed in single phase. The project construction is likely to commence in 2025 and is expected to enter into commercial operation in 2028.
The project is currently owned by Gabinete para a Administracao da Bacia Hidrografica do rio Cunene.
Utiundumbo is a reservoir based project. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, is expected to be 2 in number. The penstock length will be 250m. The project is expected to generate 743 GWh of electricity. The project cost is expected to be around $406m.
The project construction is expected to commence from 2025. Subsequent to that it will enter into commercial operation by 2028.
π Key Information
π
Tender Reference No.
485277588
π
Publication Date
03 Mar 2023
π°
Estimated Value
USD 406000000
π
Sector
Renewable Energy
π
Deadline
31 Dec 2028
π
Notice Type
Projects
π
Location
Angola
π
Contract Duration
5 Years 9 Months 28 Days
π
Documents & Downloads
No documents found
π·οΈ CPV
No CPV found
Need help with this bid?
Our bid experts can help you find, evaluate & win more tenders.