📋 Tender Overview
Description: The Uplands and Garry Drive reservoirs are connected to the plant by a single fill line that was constructed in 1980. Failure of that line would result in the City losing a third of its water distribution capacity, along with impacting high volume industrial users in north Lethbridge. This project will provide redundancy in the event of failures.