📋 Tender Overview
Project Description: The Union Line over Sylvester Drain Culvert Rehabilitation Project consists of shallow depth concrete removals and repairs to the existing concrete culvert ends. This project includes installation of concrete extensions to the ends of the existing structure, extending the culvert ends with sloped rip-rap erosion protection, waterproofing of the existing concrete deck, installation of new drainage piping at the east corners of the structure to outlet beyond culvert ends, widen existing field entrances east of the structure, reinstate asphalt road surface, and extend granular shoulders over the crossing. Design stages of this rehabilitation project will begin in the fall of 2023 with anticipated tender between July and September 2024, with the 2-year construction timing window beginning January 2025 until December 2026.