Scope :
Umtu Substation – Upgrade is a 765/400kV substation located at Umtu, Cape, South Africa. The substation is proposed and is expected to be commissioned in 2027. The Umtu Substation – Upgrade will be operated by Eskom Holdings SOC Ltd.
The designed voltage level of the substation is 765/400kV and the operating voltage level is 765/400kV. The step in voltage of the project is 765kV and the step out voltage is 400kV.
Umtu Substation – Upgrade is owned by Eskom Holdings SOC Ltd.
🔍 Key Information
📄
Tender Reference No.
503639149
📅
Publication Date
08 May 2024
💰
Estimated Value
N/A
🌐
Sector
Energy, Power and Electrical
📅
Deadline
31 Dec 2027
📝
Notice Type
Projects
📍
Location
South africa
📑
Contract Duration
3 Years 7 Months 23 Days
📁