Location Tula RamalType of investment GreenfieldSubsector Transport Storage DistributionActive Gas pipeline 17 km Scope The project consists of the design construction operation and maintenance of a gas pipeline with a capacity of 505 million cubic feet per day MMPCD. The approximate length of the gas pipeline is 17 km and 30 inches in diameter. The Tula branch transports natural gas from the Cempoala-Santa Ana system to the Tula generation plant in the state of Hidalgo.
π Key Information
π
Tender Reference No.
444752116
π
Publication Date
08 Jun 2019
π°
Estimated Value
MXN 1313730220
π
Sector
Oil and Gas
π
Deadline
31 Dec 2041
π
Notice Type
Projects
π
Location
Mexico
π
Contract Duration
22 Years 6 Months 23 Days