📋 Tender Overview
Project No. : 3302ST
Description: The project provides for engineering and construction services for major culvert improvements at various locations along the Pinewood Fingers Creek. Culvert upgrades anticipated includes the CP Rail Crossing, removal of the historical CN Rail Crossing, upsizing the culvert from Jane Street to Copeland Street, channelization downstream of Tackaberry Drive, upsizing the culvert crossing Tackaberry Drive, and upsizing the culvert crossing the Ministry of Transportation Highway 17 corridor. Engineering services will include condition inspection, preliminary design, detailed design, agency approvals, contract drawings, specifications, tendering and construction.