📋 Tender Overview
Project Description : Construction of approximately 390 metres of water transmission main in Northern Lantz (Ryan Avenue to the Armco lands), where a future water tower is recommended as per the Infrastructure Capacity Study (Dillon 2008). This transmission main is an extension of the Lantz Transmission Main completed in 2018/2019 which was required to provide an additional water supply line to Lantz, should the existing line be out of service. Further study amount has been increased from $600,000 to $1,150,000 based on current market conditions.