📋 Tender Overview
Description : Implement safety improvements for the top 20 collision prone intersections per the network screening study presented to Council in June 24, 2019. Short term improvements were implemented through 2022. This project involves implementation of medium and long-term improvements for the top 20 collision prone intersections at selected locations. It is anticipated that 2 to 3 locations will be completed per year subject to TransLink funding and scope of works; otherwise 1 to 2 locations will be completed per year. Major Cost Components: Road geometry changes such as road widening, addition or lengthening of left-turn lanes, addition or realigning of right-turn lanes, redesign of existing channelized right-turn lanes, widening sidewalks and wheelchair ramps, completion of pedestrian and cycling connections, streetlighting upgrade, traffic signal modifications (i.e., added left-turn phase), relocation of driveways and land acquisition. Improvements planned for 2024 involve design of upgrades at the Sea Island Way and Garden City Road intersection, and at the Alderbridge Way and Shell Road intersection. Works will include survey, detailed design works, consultation with external agencies (Canadian National Rail, Ministry of Transportation and Infrastructure) and permit applications as required. Funding for construction at the planned locations will be sought as part of future capital programs. Funding: Roads DCC program; potential funding from TransLink, ICBC and development.