📋 Tender Overview
ScopeThe Project includes the construction operation and maintenance of the solar farm and battery infrastructure. Associated infrastructure is also proposed including operation and maintenance of buildings civil works and electrical infrastructure required to connect to the existing transmission network. The project is located in the New England Renewable Energy Zone.The key components of the project include construction of a 120MW Thunderbolt Energy Hub solar farm which will include approximately 320000 flat plate PV modules anda 400 MW lithium-ion battery which stores energy produced by the solar and wind farm.