Consultancy Oil and Gas Infrastructure and construction

Three Regasification Platforms Tender

πŸ›οΈ MINISTRY OF ENERGY TRANSITION AND SUSTAINABLE DEVELOPMENT
πŸ“„ Tender ID: 503782907 πŸ“… Published: 13 May 2024

πŸ“‹ Tender Overview

Scope :

Morocco has planned the construction of three regasification plants, one of them in Nador and the other two on the Atlantic side of the country, one of them in the vicinity of Western Sahara, a region considered by the Moroccan state as part of its southern provinces.

Thus, Morocco's Ministry of Energy Transition and Sustainable Development plans to erect three regasification platforms. One of them near the Mediterranean coast, in the vicinity of Nador, and the other two near the Atlantic Ocean.

The first regasification stations will become operational in 2027 after a strategic memorandum of understanding between representatives of the Ministry of the Interior, the Ministry of Economy and Finance, the Ministry of Equipment and Water and the Ministry of Energy Transition and Sustainable Development.

A regasification plant is an industrial facility that exists between the extraction of liquefied natural gas and the natural gas distribution network. It is where the process that converts liquefied natural gas into natural gas takes place.

In the regasification process, the liquefied natural gas is transported to the vaporisation systems, where the temperature of the liquefied gas is raised using seawater, thus converting the liquid into gas.

Under Moroccan plans, the port of Nador West Med will be equipped with a gas pipeline, connected to the Maghreb-Europe Gas Pipeline (GME), and will be used mainly to feed ONEE's combined cycle gas-fired power stations, which combine combustion and steam turbines, including those of AΓ―n BΓ©ni Mathar and Tahaddart, to produce electricity.

This project will be followed in the short term by another regasification platform, built along the Atlantic coast, near the Jorf Lasfar industrial estate (17 km south of El Jadida), or in Mohammedia, as reported by La Razon.

πŸ” Key Information

πŸ“„
Tender Reference No.
503782907
πŸ“…
Publication Date
13 May 2024
πŸ’°
Estimated Value
N/A
🌐
Sector
Consultancy
πŸ“…
Deadline
31 Dec 2027
πŸ“
Notice Type
Projects
πŸ“
Location
Morocco
πŸ“‘
Contract Duration
3 Years 7 Months 18 Days

πŸ“ Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
πŸ•’ Submission deadline
424
days remaining Β· 31 Dec 2027
πŸ”” Set Alert

🧭 Quick Facts

Authority MINISTRY OF ENERGY TRANSITION AND SUSTAINABLE DEVELOPMENT
Country Morocco
State / UT N/A
Tender Type Project Information
Currency N/A
Similar Tenders
Loading similar tenders…