π Tender Overview
Scope: To Set up 186 MW Tato Phase I Hydropower Project at Tato district headquarter in Shi-Yomi district of Arunachal Pradesh.
Hydropower project is in the pipeline in Shi-Yomi district of Arunachal Pradesh.
This project to be set up in place would be executed by the North Eastern Electric Power Corporation Limited (NEEPCO), a government of India enterprise. CM Pema Khandu have challenges in terms of difficult terrains and topography. They need to convert these challenges into resources and hydropower is one way of doing it. The hydropower project will come up at district headquarters Tato with capacity of 186 MW. The project would be executed by NEEPCO, replacing private agencies engaged earlier.
Tato Phase I is an 186MW hydro power project. It is planned on Yarjep river/basin in Arunachal Pradesh, India. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the announced stage. It will be developed in a single phase. Post completion of the construction, the project is expected to get commissioned in 2029.
The project is being developed by Siyota Hydropower and is currently owned by North Eastern Electric Power with a stake of 100%.
Tato Phase I is a run-of-river project. The gross head and net head of the project will be 164m and 153.4m respectively. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, is expected to be 3 in number. The penstock length will be 20m. The penstock diameter will be 2.4m. The project is expected to generate 802 GWh of electricity.
The hydro power project consists of 3 turbines, each with 62MW nameplate capacity.