📋 Tender Overview
ScopeThe proposed Sydney Metro West will work together with the existing T1 Western Line between the Sydney CBD and Parramatta which is expected to be overcrowded by the early 2030s despite ongoing upgrade works.The alignment will include stops including new and upgraded existing stations atWestmeadParramattaSydney Olympic ParkNorth StrathfieldBurwood NorthFive DockThe Bays PrecintcPyrmont andSydney CBD. While the base case delivery strategy had three separate packages for Rollingstock Signalling and Operations and Maintenance these have now been restructured to be procured as a single package called Trains Signalling Maintenance and Operations TSMo.While the TSMo package is intended as a Design Build Operate and Maintain package Sydney Metro noted in October 2020 that they will further assess combining TSMo with Line-Wide Work into a single PPP package.