📋 Tender Overview
Project Number : PUB078
Project Description : The Nonquon River Subwatershed Study and Nonquon Industrial Tributary Area Master Drainage Plan (MDP) includes a conceptual design for a centralized stormwater management facility, located adjacent to the Township Works Yard at 1350 Reach Street in Port Perry. In 2017, Chisholm, Fleming and Associates completed a Stormwater Pond Preliminary Design for this facility. The proposed Stormwater Management Facility (SWMF) will be located immediately south of Regional Road 8 (Reach Street) between the existing Northport and Reach Subdivisions. The facility will implement a modified on-line pond with a by-pass channel to allow for continuous baseflow for the passage of identified fish species between the designated Provincially Significant Wetland (downstream of Reach Street) and one of the tributaries upstream of the proposed SWMF. The SWMF will provide stormwater quantity and quality control for the Northport and Reach Subdivisions and stormwater quality control for a portion of the lands in the Mitchell Subdivision. The facility is funded through Development Charges, historic developer contributions and the municipal projects reserve