📋 Tender Overview
Description:The purpose of this project is to address local flooding, drainage and serviceability issues in the Molendinar catchment. This is to ensure that the level of service provided in this catchment meets the objectives and requirements of the City Plan, Stormwater Drainage Management Strategy (G02.1213.031), Stormwater Drainage Management Plan (G21.0518.012) and Flood Mitigation and Drainage Asset Management Plan. A Stormwater Drainage Study (2015 and 2021) identified potential minor local flooding issues in the vicinity of Darling Court. In accordance with the delivery category system documented in the Stormwater Drainage Management Strategy, this project has been prioritised and is currently scheduled within the 10 year capital works catchment program.