📋 Tender Overview
Description:The purpose of this project is to address local flooding, drainage and serviceability issues in the Southport catchment. This is to ensure that the level of service provided in this catchment meets the objectives and requirements of the City Plan, Stormwater Drainage Management Strategy (G02.1213.031), Stormwater Drainage Management Plan (G21.0518.012) and Flood Mitigation and Drainage Asset Management Plan. Prioritisation of the catchment has been based on observed local flood data, condition and age of existing assets and the South East Queensland Regional Plan where Southport is identified as an economic cluster and area for consolidated development. A Stormwater Drainage Study (2013 and 2020) identified potential local flooding issues in the vicinity of Ada Bell Way that requires an upgrade of the existing drainage system. In accordance with the delivery category system documented in the Stormwater Drainage Management Strategy, this project has been prioritised and is currently scheduled within the 10 year capital works catchment program.