📋 Tender Overview
Description : The purpose of this program is to identify and address (where applicable) local flooding, drainage and serviceability issues in the Biggera catchment. This is to ensure that the level of service provided in this catchment meets the objectives and requirements of the City Plan, Stormwater Drainage Management Strategy (G02.1213.031), Stormwater Drainage Management Plan (G21.0518.012) and Flood Mitigation and Drainage Asset Management Plan. A Stormwater Drainage Study (2015 and 2021) identifed potential local flooding issues in the vicinity of Little Usher Ave, Turpin Road, Brisbane Road, Government Road, Stoke Lane (Central Street to Grace Ave), Whiting Street and Pengana Street. In accordance with the delivery category system documented in the Stormwater Drainage Management Strategy, the projects in this catchment have been prioritised and are currently scheduled within the 10 year capital works catchment program.