📋 Tender Overview
Description :The purpose of this project is to address failed infrastructure, local flooding, drainage and serviceability issues in the alone Lorenzo Drive in Upper Coomera. This is to ensure that the level of service provided in this catchment meets the objectives and requirements of the City Plan, Stormwater Drainage Management Strategy (G02.1213.031), Stormwater Drainage Management Plan (G21.0518.012) and Flood Mitigation and Drainage Asset Management Plan. The allocation in 2022-23 is for design with construction in 2023-24. A Stormwater Drainage Study and condition assessment of existing stormwater infrastructure completed in 2020, identifed level of service issues in the location of Lorenzo Drive drainage network. Allocation of funds has been included in the 4 year capital works catchment program to renew and upgrade this drainage network.