📋 Tender Overview
E Street from Bay Boulevard to H Street (1 miles) - Extension of E Street and F
Street west of Bay Boulevard to H Street, and the realignment of Gun Powder Point
Drive for the Chula Vista Bayfront redevelopment. Project also includes the
construction of a roundabout (at the new intersection of E Street and Gunpowder
Point Drive), Class I and II Bike Paths, and sidewalks. E Street between Bay
Boulevard to the roundabout will be 4 travel lanes (2 per direction); all other
segments will be 2 travel lanes (1 per direction). Phase 1: E Street from Bay
Boulevard to Gunpowder Point Drive Roundabout. (Now Open to Traffic) Phase 2:
E Street from Gunpowder Point Drive Roundabout to H Street. The project is
identified and included in the Chula Vista Bayfront Master Plan and the Bayfront
Transportation Development Impact Fee Nexus Study as "BAY-13".