Renewable Energy Infrastructure and construction

South Tarawa Renewable Tender

πŸ›οΈ MINISTRY OF FINANCE AND ECONOMIC DEVELOPMENT
πŸ“„ Tender ID: 500016558 πŸ“… Published: 31 Jan 2024

πŸ“‹ Tender Overview

Scope :
The proposed project will initiate and contribute to the transformation of the kiribati energy sector to one that is low-carbon and adapted to growing climate and natural hazards. it will do this by installing the innovative, climate-adapted and efficient floating pv (fpv) for power generation and for services and benefits beyond electricity.
the project will indicatively install 4 megawatts (mw) fpv, 3 megavolt-ampere (mva) /5 megawatt-hour (mwh) bess, and 33 kilovolt (kv) underground transmission network on betio, as well as 5 mw fpv, 4 mva/xx mwh bess, and 33 kv underground transmission network in bikenibeu, including all related grid integration and control systems. adaptive low-carbon productive uses of energy infrastructure installed. the fpv systems will be designed to integrate priority sustainable value-added end-uses to maximize the use of daytime solar energy. the project will also indicatively install productive uses of energy infrastructure such as (i) a water storage, treatment, and distribution system, (ii) an agriculture/aquaculture pilot project (iii) electric vehicle and charging station, and (iv) coastal protection and disaster risk reduction measures. the project will also include institutional capacity strengthening.
Kiribatis remoteness from major markets and most resources leads to high import costs, while its low elevation averaging only 2 meters above sea level creates severe vulnerability to sea-level rise and other climate change impacts. like many other small pacific islands, kiribatis power generation and transport rely heavily on imported diesel fuel, transported over long distances across the ocean and subject to weather and climate-change related supply disruptions. this dependence exposes kiribati to high and fluctuating oil prices and has resulted in one of the regions highest costs of power generation. around 60% of kiribatis population of 119,449 (2020 estimate) lives in south tarawa, which has a land area of only 16 km2. the extreme land constraint limits food production further exposing the country to the high cost of imported food. saltwater intrusion and other natural hazards endanger the limited freshwater resource and further damage the aged water supply infrastructure, both contributing to the spread of water-borne diseases and greenhouse gas emissions from boiling water using kerosene or biomass. all infrastructure lies on land close to the coast.
the government of kiribati has prioritized strengthening fuel security and reducing emissions and hopes that continued investments in renewable energy, energy storage, and distributed technologies improve the countrys energy security, increase grid reliability, while reducing diesel consumption. however, the approach to developing the energy sector has focused on maintaining the existing generation and distribution network, and progressively replacing diesel with land-based pv.
due to climate change, the current model to developing the energy sec

πŸ” Key Information

πŸ“„
Tender Reference No.
500016558
πŸ“…
Publication Date
31 Jan 2024
πŸ’°
Estimated Value
N/A
🌐
Sector
Renewable Energy
πŸ“…
Deadline
31 Dec 2026
πŸ“
Notice Type
Projects
πŸ“
Location
Kiribati
πŸ“‘
Contract Duration
2 Years 11 Months

πŸ“ Documents & Downloads

View All Documents β†’
# Document Name Type Action
2
T500016558.html
HTML

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
πŸ•’ Submission deadline
59
days remaining Β· 31 Dec 2026
πŸ”” Set Alert

🧭 Quick Facts

Authority MINISTRY OF FINANCE AND ECONOMIC DEVELOPMENT
Country Kiribati
State / UT N/A
Tender Type Project Information
Currency AUD
Similar Tenders
Loading similar tenders…