Energy, Power and Electrical Consultancy Services Infrastructure and construction

Somalia Somali Electricity Tender

πŸ›οΈ FEDERAL MINISTRY OF ENERGY AND WATER RESOURCES MOEWR
πŸ“„ Tender ID: 457445162 πŸ“… Published: 29 Mar 2022

πŸ“‹ Tender Overview

Project ID: P173088
Region: Africa east

The proposed project aims to support the reestablishment of the Somalia Electricity Supply Industry(ESI)for improved delivery of electricity services to enhance job creation and improved public services delivery. Currently, sector operations are owned, managed and operated by the private sector (ESPs) whereas the government institutions are inthe formative stage with the policy, legal and regulatory frameworks at various stages of development. The proposed project will help address some of the key sector challenges that contributes to lack of efficient, reliable and low cost electricity services, namely: (i) absence of an integrated national grid and duplication of distribution networks by the ESPs; (ii) poor operations practices leading to low generation efficiency and high distribution network technical and commercial losses; and (iii) lack of an appropriate institutional and regulatory enabling environment.Proposed Project Components.30.The total cost of the proposed project is estimated at US$ 150million. The project will consist of the following four main components: 31.Component 1 –Distribution network reconstruction, reinforcement and operations efficiency in the major load centers. Sub-transmission and distribution network reconstruction and reinforcement in the major load centers through integration of ESPs’ distribution networks and existing generation to optimize distribution network operationsand scale-up of generation capacity. These activities will support the electricity service providers to: (a) decrease in the cost of operations; and (b) improve electricity supply and reliability. The proposeddistribution and sub-transmission investments will enable the establishment of integrated distribution offtake infrastructure to enable scale-up of generation and interconnection with neighboring countries. 32.Component 2 –Renewable energy generation optimization. Hybridization and optimization of existing generation for increased electricity supplythrough installation of Battery Energy Storage Systems(BESS) and solar PV systems at existing diesel-based generation stations. Such hybrid opportunities offer significant improvements in fuel efficiency, fuel consumption, extended generator lifespans, reducing GHG emissions and combustion pollution, along with less reliance on fuel imports. Further to the proposed efficiency enhancements under component 1, this subcomponent will support to increase the level of renewable energy penetration.

πŸ” Key Information

πŸ“„
Tender Reference No.
457445162
πŸ“…
Publication Date
29 Mar 2022
πŸ’°
Estimated Value
USD 150000000
🌐
Sector
Energy, Power and Electrical
πŸ“…
Deadline
31 Dec 2026
πŸ“
Notice Type
Projects
πŸ“
Location
Somalia
πŸ“‘
Contract Duration
4 Years 9 Months 2 Days

πŸ“ Documents & Downloads

View All Documents β†’
# Document Name Type Action
2
T457445162.html
HTML

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
πŸ•’ Submission deadline
59
days remaining Β· 31 Dec 2026
πŸ”” Set Alert

🧭 Quick Facts

Authority FEDERAL MINISTRY OF ENERGY AND WATER RESOURCES MOEWR
Country Somalia
State / UT N/A
Tender Type Project Information
Currency USD
Similar Tenders
Loading similar tenders…