📋 Tender Overview
Beneficiaries: Kosovo*
Investment window: Energy
Lead IFI: KFW
Status: Preparation
Kosovo Energy Corp. plans to install a solar power plant of up to 100 MW where it used to dump ash and the overburden from coal mining.
Former ash dump fields in the vicinity of thermal power plant Kosovo A and former overburden dump Dragodan need to be revitalized for the construction of the photovoltaic unit, the announcement adds. They span 150 hectares. The future solar power plant’s annual output is estimated at 145 GWh. The agency added there is a possibility to install a complementary storage system for heat or even electricity, with a capacity of 50 MWh, as part of Solar4Kosovo.