π Tender Overview
Scope of Work:
Construction of 150 MW Solar Power Plant in Biskra Region.
The project construction is expected to commence from 2025. Subsequent to that it will enter into commercial operation by 2026.
The bidders are:
CWE Algeria, a unit of China International Water and Electric, in partnership with China Nuclear Industry Huaxing Construction Co. (HXCC) and Yellow River Engineering Consulting Co., Ltd. (YREC)
Algeria-based Eurl Hamdi
China's SepcoIII Electric Power Construction
Algerian contractor Butec in partnership with MCT
China State Construction Engineering Corp.
Algerian energy producer Cosider Canalisation, in partnership with Italian inverter maker Fimer
Algeria-based Amimer Energie
The Solar Djazair consortium, led by Algerian engineering company Chiali Services
PowerChina, in partnership with Sinohydro
Turkey-based Kalyon Enerji
China National Technical Import and Export Corp. (CNTIC), in partnership with China's Risen
Shanxi Installation Group Co., Ltd.
Sarpi Spa, a 100% subsidiary of Sonatrach, an Algerian state-owned gas and energy company
Algeria-based Alelec's consortium
Turkey-based ΓzgΓΌn Insaat
China Petroleum Engineering and Construction Corp.
Powerchina Huadong Engineering Corporation Ltd.
China-based Sumet Complete Equipment and Engineering Co. Ltd
Mcc International Incorporation Ltd.
Turkey-based contractor Aslan Yapi
Previous Events:
March 2023- Algerian state-owned utility Sonelgaz has issued a tender for the development and construction of solar power plant. Due Date was - May 29 2023.