📋 Tender Overview
ScopeThe Soapstone extension is a new roadway approximately one-half mile long between Sunrise Valley Drive and Sunset Hills Road. The project is located just west of the Wiehle-Reston East Metrorail Station and would include a new bridge crossing over the Dulles Corridor. On the south the proposed new road would be an extension of the existing north-south oriented Soapstone Drive where it intersects with Sunrise Valley Drive. AOer crossing the Dulles Corridor the new roadway would terminate at a new intersection with Sunset Hills Road. The typical section of the new roadway features a three-lane cross-section one travel lane in each direction and a two-way leO-turn-only lane 5-foot wide on-road bicycle lanes on each side a 5-foot wide concrete sidewalk on the west side and a 10-foot wide shared use path on the east side for a total width of about 100 feet. The proposed roadway would provide an additional crossing to supplement two existing crossings of the Dulles Corridor in Reston Reston Parkway and Wiehle Avenue. The project would provide additional capacity across the Dulles Corridor reduce congestion and delay at intersections along Wiehle Avenue and improve accessibility and mobility to and within the area surrounding the Wiehle-Reston East Metrorail Station. By including bike lanes sidewalks and an additional facility for local and regional transit operators to utilize the project improves multimodal connectivity to the Wiehle-Reston East Metrorail Station.