📋 Tender Overview
Project Description: The Sixth Line West over Government #2 Drain Culvert Rehabilitation Project consists of rehabilitations to the culvert ends and removal and replacement of the concrete bag block retaining walls. This project includes shallow concrete repairs, installation of new concrete block retaining walls, sloped rip-rap erosion protection, reinstatement of adjacent field entrances and drainage piping, reinstatement of the granular road surface. This project will be in the design stage in 2026 with anticipated tender between October and December 2026, with the 2-year construction timing window beginning January 2027 until December 2028.