📋 Tender Overview
Project : ENG-003-13
Project Description : Sixth Concession Drain provides the storm water outlet to over 900 hectares of land within the City of Windsor via approx. 4.5 km of open channel plus 1.4 km of piped drain/sewer. The condition of Baseline Road and the municipal drain along Baseline Road required emergency repairs that were completed. Additional maintenance and remediation is required to maintain service. As part of the Upper Little River Stormwater Master Plan EA and Sandwich South Master Servicing Plan, the 6th Concession Drain is planned to be relocated and improved to provide more stable side slopes from 7th Concession Road to its outlet at the Little River. These works will be phased depending on development pressures in the Sandwich South area. The first priority is the section between 7th Concession Road and 8th Concession Road to service the East Pelton Secondary Plan area. Due to the current condition of the 6th Concession Drain, urgent repairs to the existing drain alignment from 8th Concession Drain to the Little River are expected to proceed as the first phase of construction. Detailed design is underway. Phase 1: Repairs from 8th Concession Road to Little River Phase 2: Improvements from 7th Concession to 8th Concession Phase 3: Phased improvements from 8th Concession to Little River